It starts with the lot, not the floor plan
Before anyone draws a house, we look at three things: what the zoning allows on your lot, what it will cost to build there, and what the finished home will be worth in its town. Then we tell you which path makes sense: renovate the house that's there, tear down and build new, or walk away. Sometimes the honest answer is not to build, and we'll say so.
If you're still shopping for land, we can review a lot or a teardown before you sign, so you know what can be built on it and what it's likely to cost.
What design-build means here
In a traditional project you hire an architect, then put the drawings out to bid, then hire a builder. With design-build, design and construction sit under one contract and one point of responsibility. Budget, design and buildability are worked out together from day one, so the drawings describe a house that can actually be built for the number you agreed on.
We start by understanding what you need and taking the challenges head-on, whether that’s a zoning constraint, limited space, structural issues, risk or budget. We do a lot of the design in house, and we also collaborate with top architects and interior designers. Then we assemble the right team for the project. Our principal supervises as owner all the way through.
What's included
- Lot and zoning review: coverage, floor area, height, setbacks and any overlay or environmental limits.
- Design coordination: architecture, structural and civil engineering, surveys and soil reports.
- Budget and schedule set before construction drawings are finished.
- Permits and approvals: building department, and zoning or planning board review when a project needs it.
- Demolition and site work, foundation, framing, roofing, mechanical, electrical and plumbing.
- Interiors: kitchens, baths, millwork, stairs, flooring and finishes.
- Closeout: final inspections, certificate of occupancy and a documented punch list.
How we typically build
Our standard new home in the Northern Valley is a 2½-story wood-frame house over a full concrete basement, with a pitched roof, designed to the local height limit (30 feet in many Bergen County residential zones). Basements generally don't count toward floor area, so a finished lower level adds living space without using up the lot's floor-area allowance. We confirm the exact rules for your lot before design starts.
How a project runs
- Lot review. Zoning, site conditions and a first budget range. Renovate, rebuild or pass.
- Design and pricing. Plans developed with the budget, not after it.
- Approvals. Permit applications, and board hearings if a variance is needed.
- Construction. One project lead, a fixed schedule and regular site reviews with you.
- Closeout. Inspections, certificate of occupancy, punch list and warranty.
Cost and timeline
Every lot is different, so we set the price and the schedule after the lot review. As a guide, new builds and teardown rebuilds start at $500,000 (excludes land and demolition).
Registrations: NJ HIC Reg. #13VH14080800 and NJ New Home Builder Registration #0058181. Fully insured: general liability and workers' compensation. Certificates available on request. Warranty: per New Jersey guidelines.
Ground-up work: 584 Leonard Street
Two-family new construction in Greenpoint, Brooklyn, from our principal’s prior work at LTNG. When a project gives us the opportunity, we build custom features like unique stairs and railings. Here, the penthouse has a three-story floating stair up to a glass-house foyer for roof access; 584 Leonard was a 2026 NYCxDESIGN Awards Staircase honoree. Lighting is designed in, not added at the end.
Developed by LTNG in Brooklyn while our principal was co-founder and head of development there.



Experience behind the work
Before founding Largo Builders, our principal developed ground-up buildings in Brooklyn, including 584 Leonard Street and 76 North 8th Street, developed by LTNG. See About for details.

